Avatar

Trip update to ISE Database

0

When a driver completes the DVIR pre trip each day When is this updated to the ISE software database (Asset Utilization Report). Under what conditions is the information sent?

Dom

Please sign in to leave a comment.

1 comment

0
Avatar

The regulations around DVIR are 396.13 and 396.11. These two regulate the pre-trip and the post trip. 

Each day a driver must perform a pre-trip inspection and review the post trip inspection report of the last driver to have used the vehicle even if it was himself. 

Pre-trip is the first half of the equation. This message is sent in real time just like HOS messages. 

At the end of each day the driver must perform a post trip inspection to report any defect or a no defects report as he is leaving the vehicle. 

Post-trip is the second half of the equation. This message is sent in real time just like HOS messages. 

The asset utilization report is populated on the post trip information. You can confirm this by checking the created date on the Utilization Report to the data and time of the DVIR on the DVIR reports screen or the remarks in the driver log. 

Dom 0 votes